Sustainable Technology consulting for a carbon-neutral, climate-resilient living environment

 

 

Tekstvak: Infrastructure

 

Public utilities & facilities

»   CCS / CCUS (Carbon Capture, Utilisation & Storage) / BECCS.

»   BESS (Battery Energy Storage Systems).

»   Subterranean cable networks for telecommunication.

»   P2G (Power-to-Gas) / P2L (Power-to-Liquid) / P2Y, hydrogen production and storage, synthetic fuels.

 

Tasks:

   North Sea Wind Power Hub (NSWPH), Report about using P2G (Power-to-Gas) in conjunction with offshore wind farms.

2019

   Alcatel-Lucent in Nanterre (now part of Nokia Networks), planning of a new network of fiber optic cables for ADSL-internet in the area of Hauts-de-Seine.

2004

 

Transportation

»   Resilience and circularity in the maritime sector.

»   Vehicle-to-Grid (V2G), bidirectional charging.

»   Electric rail propulsion systems with high efficiency.

»   Software used: AutoCAD Civil 3D, SolidWorks, Python, Matlab.

 

Tasks:

   Alstom Transport SA in St. Ouen, analysis of efficiency improvement in electromagnetic propulsion for a light-weight monorail train (lightrail).

2002

 

© Plan-ST consultants 2008 - 2026

Homepage